Search term

Cost Savings through Monitoring Package for Wind Turbines

Geolica, Spain

Geolica is a producer of renewable energy in the wind energy sector that currently operates two wind farms in Spain, with an installed total power of 84,8 MW.
Challenge for Schaeffler:
An unexpected downtime due to damage to any component in the drive train of a wind turbine can have significant economic consequences in terms of production disruption and repair costs. To avoid that kind of situation, Geolica was looking for a condition monitoring system that would detect any damage at an early stage.

Media category: Reference / GTSGTS 0018
Date: 2012-07-02
Publisher: Schaeffler Technologies AG & Co. KG
Pages: 2
Language: English
Other languages


Get Publication

Share Publication

Share Page

Schaeffler applies cookies to secure an optimal use. With the further use of this website you accept the application of cookies. More Information

Accept